Development of Execution Model for Nuclear Energy Sector Projects Executed by Government of India Institutions

dc.contributor.guideSharma, Vipul; Mittal, Ankur, Bhargava, Kapilesh and Basu, Shekhar
dc.coverage.spatial
dc.creator.researcherChauhan, Rakesh Kumar
dc.date.accessioned2017-11-29T04:15:04Z
dc.date.available2017-11-29T04:15:04Z
dc.date.awarded12/06/2017
dc.date.completed2016
dc.date.registered01/07/2011
dc.description.abstractThe two research objectives to analyse the applicability of in-practice project execution models in infrastructure and power sector for Indian nuclear sector projects and to develop a project execution model for Indian nuclear sector and validate are framed to carry out the research.Three basic contract concepts/philosophies are derived in project execution in commercial point of view. In first concept, the owner calls for a competitive bidding for the development phase of the project. The main scope of the contractor in this stage is to deliver a basic design package. After completing the basic design package, the owner calls for another competitive bidding for the implementation phase which includes Detailed Engineering, Procurement and Construction. In second concept, the owner contacts simultaneously with two contractors for the development phase. Therefore, the owner handles two basic design packages. After completing these packages, the owner calls for a competitive bidding only between the two contractors and the final contract is awarded to one of them. Third one is similar to the first one except that same contractor carries out the two phases. After delivering the basic design package, the owner and contractor negotiate the contracting approach for the implementation phase. Sometimes the two parties do not reach an agreement. In this case, the owner calls for competitive bidding for implementing the project based on the basic design package. newline
dc.description.note
dc.format.accompanyingmaterialDVD
dc.format.dimensions
dc.format.extent176p.
dc.identifier.urihttp://hdl.handle.net/10603/183094
dc.languageEnglish
dc.publisher.institutionDepartment of Power and Infrastructure
dc.publisher.placeDehradun
dc.publisher.universityUniversity of Petroleum and Energy Studies (UPES)
dc.relation
dc.rightsuniversity
dc.source.universityUniversity
dc.subject.keywordEnergy
dc.subject.keywordNuclear energy sector
dc.titleDevelopment of Execution Model for Nuclear Energy Sector Projects Executed by Government of India Institutions
dc.title.alternative
dc.type.degreePh.D.

Files

Original bundle

Now showing 1 - 5 of 18
Loading...
Thumbnail Image
Name:
01_titlepage.pdf
Size:
23.13 KB
Format:
Adobe Portable Document Format
Description:
Attached File
Loading...
Thumbnail Image
Name:
02_acknowledgement.pdf
Size:
29.91 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
03_certificate.pdf
Size:
91.79 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
04_contents.pdf
Size:
54.46 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
05_summary.pdf
Size:
115.49 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.79 KB
Format:
Plain Text
Description: