An Improved Job Scheduling Algorithm For The Computational Grid Environment
Loading...
Date
item.page.authors
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Grid is a dynamically shared environment It comprises of
newlinegeographically distributed heterogeneous computational resources of multiinstitutional
newlinedomains with different usage policies The idle resources of
newlinemultiinstitutional domains form a virtual organization The virtual
newlineorganization provides coordinated resource sharing to solve complex
newlinescientific problems that require enormous computing power
newlineScheduling is a difficult problem of the grid Scheduling problem is
newlinea Nondeterministic Polynomial NPhard problem Computing optimal
newlinesolution for NPhard problem is intractable The reasonable assumptions are
newlinedifficult to find an optimal solution due to the dynamic grid nature Hence
newlineheuristic algorithms provide good solutions
newlineThe objective of grid scheduling is to find a feasible schedule that
newlineminimizes the scheduling criteria the makespan Makespan is the overall
newlinecompletion time of all the jobs submitted in the grid Heuristic approach
newlineproves to be the efficient approach for solving the computationally hard
newlineproblems The heuristic approach includes Minimum Completion Time
newlineMCT Opportunistic Load Balancing OLB Maxmin Minmin and
newlineGenetic Algorithm GA The Minmin heuristic performs well compare to
newlinethe other heuristic techniques
newlineThis thesis proposes three different approaches to minimize the
newlinemakespan of grid scheduling The first approach uses heuristic techniques and
newlineimplements on the basis of Minmin algorithm To reduce the makespan and
newlineimprove resource utilization the first approach includes three different
newlineheuristic algorithms Minmean Improved Minmean and Enhanced Minmean
newlinein grid scheduling The proposed heuristic scheduling algorithms works
newlinein two phases In phase 1 the algorithm allocates the jobs to the machines
newlinebased on Minmin algorithm In phase 2 the algorithm calculates the mean
newlinecompletion time and it selects the machine whose completion time is greater
newlinethan mean completion time The algorithm reschedules the tasks assigned on
newlinethe selected resources to the resource